Gladstone LNG (operational since 2015) shipped its 200th cargo as Adriatic LNG (since 2009) received its 600th this June. Gladstone – a liquefaction plant – and Adriatic – a regasification plant – both rely on Gas Land’s Nitrogen Generators.
Welcome to the Gas Land Blog.
Gladstone LNG (operational since 2015) shipped its 200th cargo as Adriatic LNG (since 2009) received its 600th this June. Gladstone – a liquefaction plant – and Adriatic – a regasification plant – both rely on Gas Land’s Nitrogen Generators.