Wheatstone LNG Commissioning and Training
One of Gas Land, Inc's biggest highlight of the year was the successful commissioning and training of all operator personnel of Wheatstone LNG. Upon commissioning, the System can generate about 3000 Nm3/hr of Nitrogen at 96% purity. The Nitrogen Generator also has a Liquid Nitrogen Storage and Vaporization System which serves as a back up to the primary Membrane Nitrogen Generator. Two Liquid Nitrogen Tanks each with a capacity of 100,000 US gallons along with six vaporizers form to serve as the Liquid back up System. Per CEO, Khalil Jaber, "Operator training with Chevron personnel went exceedingly well and Gas Land, Inc. is proud to be partners for this amazing project."
Queensland LNG Upgrade
Gas Land, Inc. successfully upgraded 3 Nitrogen Generators for Queensland LNG Plant located in Curtis Island, Australia. The upgrade enabled to increase Nitrogen output by 65% for each System at 96% purity. The expansion capability of each System is attributed to Gas Land, Inc's unique and proprietary design.
Summer Engineering Internship Program - University of California, Irvine
Gas Land, Inc. launched its first ever internship program, a comprehensive 10-week program with the primary goal of providing professional engineering experience to two students Danielle De Arcos and Karl Quilos who are both senior Mechanical Engineering students at the University of California, Irvine. They were exposed to all stages of Gas Land, Inc’s projects and had the opportunity to participate in project bids, engineering design, procurement and solving daily technical issues. The internship experience is unique since projects are interdisciplinary requiring expert integration of Chemical, Mechanical, Electrical and Process Engineering.
Hydrocarbon Engineering Publication
Gas Land, Inc. gets published in Hydrocarbon Engineering, a leading Oil and Gas magazine. The article explains the various processes involved to generate Nitrogen and the many uses of Nitrogen in LNG plants worldwide.